St Marks Court is described as a Sheltered Housing property Managed by the Orbit Housing Group. The scheme is aimed for people of 55 years and over. The property was built in 1984 and has 49 single bedroom flats providing independent living for the older person. The three floor property sits on the outskirts of Rugby in the suburb of Bilton under the shadow of magnificent St Marks Church.
Midlands Office 01543 273673
Northern Office 01928 594790
Installation Project Summary
St Marks Court is described as a Sheltered Housing property Managed by the Orbit Housing Group. The scheme is aimed for people of 55 years and over. The property was built in 1984 and has 49 single bedroom flats providing independent living for the older person. The three floor property sits on the outskirts of Rugby in the suburb of Bilton under the shadow of magnificent St Marks Church.
Existing Lift Installation
The original lift was a 2 Stop 1000 Kg / 13 Person Open Front Hydraulic passenger lift installed in the late 1980’s by Evans Lifts. The building was adapted at that time with a non load bearing lift shaft, so the lift was installed in a self supporting steel structure. The lift was identified as needing a major modernisation/replacement due to the declining reliability of the lift and its non compliance to modern standards such as the DDA and the Lift Regulations.
Summary of Modernisation Works
- Full Turnkey Solution to a consultant led specification.
- Asbestos Survey, scaffolding and Lifting Beam test.
- Remove and disposal of the existing Lift Equipment, Lift Structure and hydraulic oil.
- Hoardings, Floor Protection & Builders Work adaption’s to existing lift shaft to accommodate new lift equipment.
- Installation, commissioning and maintenance on temporary stair lifts for the duration of the works.
- New certified Electrics by a qualified NIC EIC electrical contractor.
- Skip and Storage container
- Installation, testing and Commissioning of a new 2 floor 1000kg/13 Person MRL passenger lift in a Structure.
- Decoration, making good and clean down.
- Consultant Witness Testing.
The Project
The project ran for approximately seven weeks from the moment the lift was taken out of service to the consultant witness testing and being handed back to the client. In the usual approach for projects with Orbit Housing and prior to works commencing a pre-start meeting with the residents and staff over a buffet laid on by Concept, to go over the programme of works and manage the clients expectations throughout the project.
The works were carried out by a team of carefully selected sub-contractors who over a period of successful projects have experience in the customers requirements project delivery. To minimise disruption to the home, stair lifts were provided for the duration of the contract.
Service
Installation
Client
Orbit Housing St Marks Court,
Rugby
Registration Number: 07779086 | Place of Registration: England & Wales
Copyright©2020 Concept Elevators All Rights Reserved. Privacy Policy