Belonging to the Warner Leisure Hotel Group and once owned by George V’s Lord in Waiting, Bembridge Coast Hotel overlooks the Solent. The late Queen Mother came here to watch the yachts racing during Cowes Week. The hotel is one of the most popular with guests all year round and is situated on the eastern most point on the Island. The hotel has a wonderful beach and is an ideal base for touring the Isle of Wight. Balcony rooms allow guests to enjoy the sunrise over the Solent,

Midlands Office 01543 273673
Northern Office 01928 594790

Modernisation Project Summary

Belonging to the Warner Leisure Hotel Group and once owned by George V’s Lord in Waiting, Bembridge Coast Hotel overlooks the Solent. The late Queen Mother came here to watch the yachts racing during Cowes Week. The hotel is one of the most popular with guests all year round and is situated on the eastern most point on the Island.

The hotel has a wonderful beach and is an ideal base for touring the Isle of Wight. Balcony rooms allow guests to enjoy the sunrise over the Solent,

Existing Lift Installation

The building is in two blocks (North and South), each block is served by one Stannah hydraulic 3 floor open front 630kg/8 person passenger lift, installed in the late 1990’s. The lifts have been showing reliability problems and being business critical due to the hotel target customer base is the older generation, many of whom rely on the lift service due to accessibility problems. An unreliable lift service created a nightmare scenario for the hotel often having to swap accommodation at late notice due to lifts being out of service. After consultation with Concept Elevators it was proposed for a full modernisation of the hydraulics, control system, car door (including operator) and a car reline to freshen up the tired lift car interiors.

Summary of Modernisation Works
  • Full Hydroelite control system and hydraulic package.
  • Newlandingstations,LandingindicatorsandCarOperatingPanel.
  • New Fermator door operator, car door panels and car sill.
  • New car reline to match some new lifts recently installed by Concept for the Warner Group
  • New Landing door panel skins on the North lift and polish landing door tracks (Door frames painted by Hotel)
  • New Landing door panel skins on the South Lift and polish landing door frames and tracks.
  • New certified Electrics by a qualified NIC EIC electrical contractor.
  • Skip and Site Storage
  • Testing and commissioning by an independent Engineer.
  • Formal customer handover.
The Project

Each lift was programmed for a three week lift down time period with the hotel managing their booking operations to suit. This ensured that guests with access difficulties were not inconvenienced. To complete the project Concept co-ordinated between 4 of their appointed sub-contractors, namely the electrician, the lift engineering team, the car re-line contractor and the independent lift tester. With hard work and great communication Concept Elevators delivered the first lift early, allowing the customer to let us start works on the second lift a week early. Concept Elevators delivered the whole project two weeks early much to the delight of our customer and their guests.

Service

Modernisation

Client

Warner Leisure Hotels,
Isle of Wight

Gallery
Existing Lift Photographs
Completed Works